Project

General

Profile

Bug #54925

échec des tests avec psycopg2 2.9

Added by Frédéric Péters about 3 years ago. Updated about 3 years ago.

Status:
Fermé
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
16 June 2021
Due date:
% Done:

0%

Estimated time:
Patch proposed:
No
Planning:
No

Description

Entre https://jenkins.entrouvert.org/job/passerelle/2233/consoleFull ok et https://jenkins.entrouvert.org/job/passerelle/2234/consoleFull pas ok, modification dans les dépendances tirées, psycopg2-binary==2.8.6 vs psycopg2-binary==2.9.

    def utc_tzinfo_factory(offset):
        if offset != 0:
>           raise AssertionError("database connection isn't set to UTC")
E           AssertionError: database connection isn't set to UTC

Associated revisions

Revision af780607 (diff)
Added by Frédéric Péters about 3 years ago

tox: limit psycopg2 to < 2.9 (#54925)

Revision 6df40677 (diff)
Added by Frédéric Péters about 3 years ago

tox: limit psycopg2 to < 2.9 (#54925)

History

#1

Updated by Thomas Noël (congés → 2 septembre) about 3 years ago

Ça a du être dit ailleurs/avant mais pour lancer un tox en local j'ai juste posé « psycopg2-binary<2.9 » dans le tox.ini, vu ce qui existe dans Debian (sid est encore en 2.8.6) ça me semble une "solution"...?

#2

Updated by Frédéric Péters about 3 years ago

Oui c'est juste un peu lourd d'avoir à taper ça partout.

#3

Updated by Frédéric Péters about 3 years ago

Oui c'est juste un peu lourd d'avoir à taper ça partout.

(fait)

#4

Updated by Frédéric Péters about 3 years ago

  • Status changed from Nouveau to Fermé

Also available in: Atom PDF